How do you handle technician scheduling during peak seasons?

HVAC peak season is here and my dispatch board looks like a accident scene. We're already running 60 hour weeks and I'm still turning away jobs.

Currently have 12 techs, normally handle 8-10 calls per day per tech. Right now we're at 14-16 and quality is starting to slip. Callbacks are up.

What actually works? I don't need theory, I need something I can implement Monday morning.

Specifically:

  • Are you using temporary/contract techs? Worth the training overhead?
  • Overtime vs hiring — where's your break-even?
  • How do you prioritize when everything's "urgent"?

Also — anyone using the new bulk assignment feature that shipped last month? Saw the announcement but haven't had time to test.

Parents
  • Contractors... been there. Half of them can't find their own truck without GPS.

    My approach: overtime with your A-team beats contractors every time. Yes it's expensive. So is reworking a botched install.

    We run 4 ten-hour shifts instead of 5 eights during peak. Techs love the long weekends. Dispatch hates the scheduling complexity. Customers don't care as long as someone shows up.

    Break-even for us was around 15% overtime hours. Above that, hire another body.

  • ^ this. In my experience contractors are fine for labor, terrible for anything customer-facing. Had one walk into a house with boots covered in mud from the last job. Customer called me directly screaming.

    Four tens is the way. Your best techs will stay, your mediocre ones will quit. That's not a bug.

Reply Children
No Data